Bathroom Remodel
in Los Angeles

Licensed & Insured / CSLB #1144057 / Los Angeles, CA

Bathroom remodels across Los Angeles and the San Fernando Valley — plumbing, waterproofing, tile, and fixtures sequenced by one licensed team, so it's done right the first time.

Service Specs
Duration
3–8 Weeks
Scope
Demo to Finish
License
B · C-10 · C-36
What's Included

Demo to Finish
Every Detail Covered

Our bathroom remodels go from full demo to finished space — tile, fixtures, cabinetry, plumbing, lighting, and everything in between. No partial scopes, no trades you have to source yourself.

  • 01

    Demolition

    Full tear-down and waterproofing prep. We open the space cleanly so what gets built next holds for decades.

  • 02

    Tile

    Custom selection through hand-set installation. Layout, cuts, grout, and sealing — done right the first time.

  • 03

    Cabinetry

    Vanities, cabinets, and fixtures sourced and installed by finish carpenters who handle this work daily.

  • 04

    Plumbing

    Licensed rough-in through trim-out. Valves, fixtures, and pressure testing handled in-house.

  • 05

    Electrical

    Lighting layout, switching, and circuit work brought up to current code with concealed routing.

  • 06

    Walkthrough

    Final review and punch list before handover. Every item addressed before you sign off.

How We Work

Four Steps,
Every Bathroom

Every bathroom remodel runs the same way — clear estimate, locked selections, coordinated build, walkthrough at handoff.

  • 01
    Step 01 of 04

    Consultation & Estimate

    We walk your existing bathroom, discuss what you want to change, and put together a detailed estimate. You'll know the real cost before any decisions are locked in.

  • 02
    Step 02 of 04

    Design & Material Selection

    Tile, fixtures, vanities, hardware — every selection gets confirmed before demo starts. No mid-project surprises because a finish you wanted is out of stock.

  • 03
    Step 03 of 04

    Construction & Coordination

    We manage demo, waterproofing, tile, plumbing, and electrical. Our crew coordinates every phase so the project moves on schedule.

  • 04
    Step 04 of 04

    Walkthrough & Handoff

    We walk the finished bathroom with you. Everything is reviewed and signed off before handover.

Free Estimate - 4 Quick Steps

Ready to Rebuild
Your Bathroom?

Tell us about your project and we'll come out for a free on-site estimate, then give you one fixed, written price. No pressure, no pushy sales visit.

Complete the Form |Takes about a minute

Step 1 of 4

What are you planning?

Tap to continue
Reach Us Direct

Rather talk it through?

Call, email or message us on Instagram — whatever's easiest for you.

FAQ

Common Questions
About Bathroom Remodeling
in Los Angeles, CA

Answers to the questions homeowners ask most before starting a bathroom remodel across Los Angeles and the San Fernando Valley.

  1. 01

    How much does a bathroom remodel cost in Los Angeles?

    Answer

    Fixture relocations, tile and material selections, and whether the shower needs its waterproofing rebuilt are the biggest factors. A same-layout refresh costs far less than moving the toilet or converting a tub to a walk-in shower. We provide a detailed written estimate after seeing the space.

  2. 02

    How long does a bathroom remodel take?

    Answer

    Most bathroom remodels run 3–8 weeks, depending on scope, tile lead times, and plumbing complexity. We set the schedule during planning and tell you about any change before it affects the timeline.

  3. 03

    Can I stay home if it's my only bathroom?

    Answer

    Usually, yes — but it's worth planning around. We sequence the project to keep downtime as short as possible, though a full gut remodel means some period without a working bathroom in that space. We're upfront about how long during planning.

  4. 04

    Can you convert a tub into a walk-in shower?

    Answer

    Yes. A tub-to-shower conversion usually means relocating the drain, installing a new shower valve, and building a fully waterproofed shower pan — all handled under our own C-36 plumbing license.

  5. 05

    Do I need a permit for a bathroom remodel?

    Answer

    If you're moving plumbing, adding circuits, or changing walls, yes. Replacing a vanity or retiling in place often doesn't need one. We confirm what your project requires during the estimate and manage the permit when it's needed.

  6. 06

    What if you find water damage or mold behind the tile?

    Answer

    Older bathrooms sometimes hide water damage behind tile, especially around tubs and showers, that isn't visible until demolition. We stop, show you what we found, and walk through the cost and schedule impact before we continue.

Still have questions?

Call us directly — we're open 7 days a week.

Call (818) 303-3555
Areas We Service

Bathroom RemodelsAcross Los Angeles

We remodel bathrooms throughout Los Angeles County. Free on-site estimates anywhere in our coverage zone.

Map
Los Angeles County